MWE was approached to design and build a moveable platform to span a 6m pad with multiple pencil vibrators to give consistent consolidated concrete. The timeframe given to utilise the shut-down period was minimal and from a rough pencil concept, a working machine was delivered and in production within two weeks.
Once the initial design and concept was validated and production and performance deadlines met, the machine was bought back for a few design improvements and the project completed successfully.